Get on a call with us to see how we can help you
Get a QuoteLift-and-shift, replatform, refactor, or rearchitect. From NAV 2016 to Business Central, on-premises SQL to Azure SQL, or legacy monolith to Azure-native microservices. Your production systems stay live during every migration phase.
Submit brief → Azure assessment in 48 hours → migration proposal in 3 days → Sprint 1 within 1 week of sign-off
Live migration in progress
Each service migrated independently. Production stays live.
Cinema band · IT team reviewing Azure migration architecture plan

Replace with IT team reviewing Azure architecture diagram, overhead light, side profiles · 1600×533
The hidden on-premises cost. Visible when you add it up.
Azure's pay-as-you-go model typically reduces total infrastructure cost by 25 to 40% within 18 months of migration.
Pain · IT manager reviewing on-premises server cost reports

"We were spending 3 days a month just managing patches and server maintenance. Azure gave that time back to the engineering team."
Composite from Redefine Azure assessment calls
Replace with IT manager reviewing server cost reports, natural window light, side profile · 800×1000
Select the modernization approach that matches your current infrastructure and business continuity requirements. Each path uses a different set of Azure services and carries a different risk and timeline profile.
Move your existing workloads to Azure virtual machines with minimal code changes. Fastest path to cloud. Full optimization happens after migration.
Azure Migrate assessment output
Migrate to Azure-managed services with targeted optimizations. Move SQL Server to Azure SQL Managed Instance. Move on-premises apps to Azure App Service. No full rewrite.
NAV to Business Central migration plan
Restructure and optimize your application code to leverage Azure-native services: Azure Functions, Azure Service Bus, Cosmos DB. Keep your business logic, change the infrastructure layer.
Serverless refactor: order processing module
Decompose your monolith into Azure-native microservices using AKS, Azure Container Apps, and Event Grid. Maximum scalability and team autonomy. Highest long-term ROI.
AKS cluster: post-rearchitect status
Value · Azure architecture planning session, whiteboard with cloud diagram
Replace with cloud architects reviewing Azure portal on monitor, afternoon light, side angle · 1200×400
VMs configured with Availability Sets and autoscale rules. App Service plans with deployment slots for zero-downtime releases. AKS clusters with Helm charts and horizontal pod autoscaling. Every compute resource monitored via Azure Monitor.
Azure SQL Managed Instance for lift-and-shift with full SQL Server compatibility. Cosmos DB for globally distributed NoSQL. Azure Data Factory pipelines for ETL from on-premises sources. Point-in-time restore and geo-replication configured on every database resource.
Microsoft Entra ID (formerly Azure AD) configured with Conditional Access policies. SSO across Azure, Microsoft 365, and third-party SaaS. Multi-factor authentication enforced. Azure AD B2C for customer-facing identity. On-premises Active Directory sync via Entra ID Connect.
Azure Pipelines with multi-stage build and release. Branch strategies with environment-gated deployments. Infrastructure as code via Azure Bicep or Terraform. Automated testing at every stage. Rollback pipelines triggered on health check failure.
Microsoft Defender for Cloud configured with security score baseline. Azure Key Vault for secrets, certificates, and encryption keys. Network Security Groups and Azure Firewall for perimeter control. Compliance dashboards for ISO 27001, SOC 2, and GDPR readiness. Audit logs to Azure Monitor.
Azure Monitor dashboards for infrastructure health. Application Insights for end-to-end request tracing and performance profiling. Log Analytics workspace with custom KQL queries. Alerts configured for SLA thresholds. Power BI connected to Azure SQL for real-time operational reporting.
Proof · Team reviewing Azure Business Central dashboard after migration

WP Inova
Azure liveB2B Operations · Azure Cloud · Business Central
The existing NAV 2016 system lacked support for modern features and imposed limitations on customization. These constraints made it difficult to centralize orders from multiple platforms, scale operations, and adapt workflows as the business grew.
Legacy NAV 2016 constraints eliminated after migration to Business Central on Azure cloud infrastructure. Centralized order management across platforms. Compliance readiness strengthened. ERP positioned to scale with business growth.
Replace with team reviewing Azure Business Central dashboard · 1200×400
Migration milestones
Azure environment setup and Entra ID configuration
Azure subscription, resource groups, VNet, Entra ID tenant configured. On-premises Active Directory synced.
NAV 2016 to Business Central: data migration planning
C/AL code converted to AL extensions. Data migration plan validated against production data volumes. NAV continues operating.
Azure Integration Runtime: on-premises SQL to Azure SQL
Data migrated using Azure Integration Runtime. Parallel operation between NAV and Business Central during validation period.
Business Central go-live on Azure. NAV decommissioned.
Traffic cutover completed. Business Central handling all order workflows. Azure Monitor dashboards live. NAV decommissioned week after validated go-live.
Lanrover: Dynamics 365 Business Central on Azure-based infrastructure
Legacy ERP replaced with Dynamics 365 Business Central. Azure-based infrastructure design, Entra ID identity management. Improved compliance readiness and unified finance, sales, and customer data on Azure.
Based on projects we've rescued from other implementation partners. These are the gaps we see every time.
Timeline, downtime risk, and what you actually own at the end. Answered directly.
Azure assessment first. Cost depends on your current infrastructure and target path.
The free assessment identifies your current state and recommends a path. The proposal includes phase-by-phase cost estimates. You approve before Sprint 1 begins.
Azure modernization is the right investment for some situations and not others. The assessment is free. The mismatch cost is not.
Running on-premises servers with hardware refresh due in 12 to 24 months
The Lift-and-Shift cost savings often pay for the migration before the hardware refresh would have cost.
Operating Dynamics NAV, CRM, or a legacy ERP without a clear upgrade path
Replatform to Business Central or Dynamics 365 on Azure is the established path. The data migration is the hard part. We have done it.
No Entra ID and teams accessing internal systems without SSO or MFA
Identity is the highest-ROI Azure modernization for security posture and compliance readiness.
No CI/CD pipeline and deployments taking a full day or requiring manual steps
Azure DevOps Pipelines with rolling deployments recovers developer time and eliminates deploy-day risk.
Probably not the right moment for Azure modernization if:
Your infrastructure is already on Azure and running well on a supported stack
Azure optimization or new feature development may be the right next step, not modernization.
You have under 3 months of runway and need to ship revenue features
Modernization during a runway constraint creates team distraction without near-term revenue. Time it correctly.
No commitment. No pitch. A free Azure assessment and written migration proposal in 3 business days.
Submit your infrastructure brief
Tell us what you are running today: server types, ERP version, identity setup, deployment process. No need to prepare a document.
Azure assessment call within 48 hours
With a Microsoft Azure architect. We map your current stack and identify the right modernization path.
Written Azure modernization proposal in 3 days
Recommended path, Azure services, migration sequence, timeline, and phase-by-phase cost estimate.
First Azure resources live in Sprint 1
Environment setup, Entra ID, and first migrated workload in your first sprint. Production still running throughout.
No commitment. No pitch. · Assessment in 48 hours · Proposal in 3 days