Move your data into Dynamics 365, clean and checked.

Half Price Drapes: stock accuracy rose from about 82% to 99.2% once its ERP data was fixed. See the case study.

Proof

Results from fixing Dynamics 365 data

A move only works when the data is right. These are real results from Dynamics 365 data work.

  • Half Price Drapes
    99.2%
    Stock accuracy, up from about 82%.
  • Parsons Kellogg
    99.0%
    Stock accuracy once its data and reports were fixed.
  • Parsons Kellogg
    -58%
    Less time on manual reports once data fed Power BI.

These were Dynamics 365 data and reporting projects, not full migrations. Sources: Half Price Drapes, Parsons Kellogg, Parsons Kellogg.

Moving to Dynamics 365?

Get a Migration Plan from a Redefine consultant.

Get Your Migration Plan

Short answer

What is Dynamics 365 data migration?

Updated

Dynamics 365 data migration is the move of your business data into Microsoft Dynamics 365. Redefine Innovations looks at your old systems, maps each field, cleans the records and runs test loads. Then we check the data before the final switch, so your team starts with records they can trust.

Most moves go wrong in the data, not the software. Old records, copies and blank fields slip in and slow your team for months.

So we look before we move. Data you do not need can be stored, not moved.

Three ways to get to a working Dynamics 365

Pick by where you are now

WayWhat you getBest whenWhere it stops
Data migrationYou are moving from an old systemClean, tested data in Dynamics 365It moves the data; it does not set up the whole system
ImplementationYou need Dynamics 365 set upA working system built for your teamThe move of your data is its own plan
Health checkDynamics 365 is live but slowA scored report and a fix listIt finds the problems; fixes come next

What we look at first

  • [1] Every system that holds your data today
  • [2] Which records still matter
  • [3] Copies, blanks and old fields
  • [4] Who checks the data before the switch

Setting up the whole system too? See Dynamics 365 implementation or Dynamics 365 health check.

Clean data

Your data deserves a safe move.

We handle your data with care. Each record is mapped, cleaned and checked before it goes live.

See how we work
Two colleagues drawing a map from old data fields to new Dynamics 365 fields on a whiteboard

Before and after

Many sources. One clean system.

Scattered

Your data lives in many places, kept by hand.

  • Old ERP

    Kept apart

  • Spreadsheets

    Kept apart

  • Vendors

    Kept apart

  • Email lists

    Kept apart

  • Shop

    Kept apart

No single truth
Sources to piece together

5

Moved

One clean set of data in Dynamics 365.

  • Customers

    Mapped and checked

  • Items

    Mapped and checked

  • Orders

    Mapped and checked

  • Stock

    Mapped and checked

  • Prices

    Mapped and checked

  • CRM

    Mapped and checked

Dynamics 365
System your team trusts

1

Bad data calculator

What is bad data costing you?

Use your own numbers. See what clean records could save each month.

Your numbers

Monthly

5,000
85.0%
$6
98.0%

Cost of bad records per month

Your estimate

Clean now
$26K
After the move
$29K

Spent fixing bad records

$4Kper month

$47K a year if nothing changes.

Get Your Migration Plan

This is an estimate from your own numbers, not a promise.

Estimate: records a month x (share clean after the move minus share clean now) x cost to fix one. Not a promise.

Three data problems that sink a move

Tap a card to see the problem, then what we do.

An engineering mindset for Dynamics 365 data moves

We run growth the way engineers run software.

Redefine is an engineering company. Developers, Dynamics 365 and ERP engineers, data experts and business consultants sit on one team, so your data move is planned, built and checked by the same people.

  1. Analyst comparing record counts before and after a test load in a spreadsheet

    01 Our way: How we work

    Every change is a test with a success number.

    Each load has a count to match before we call it done.

    Old way: Instead of the usual agency habit

    Changes ship on opinion.

    Data is moved and hoped for.

  2. Engineer running a data import job in the Dynamics 365 Data management workspace

    02 Our way: How we work

    We fix the data at the source.

    Engineers clean records before they move, not after.

    Old way: Instead of the usual agency habit

    Fixes stop at the surface.

    The same bad rows come back.

  3. Manager reading a data import alert email on a phone that names one owner

    03 Our way: How we work

    Alerts fire the week a number drifts.

    After the switch, we watch for data errors and fix them fast.

    Old way: Instead of the usual agency habit

    Problems wait for the monthly report.

    Users find the errors first.

How Redefine works

TheREDEFINEMethod

Look first, move what matters, check before the switch.

A move that copies everything costs more and breaks more. We find what matters, store what does not, and move in steps.

Get Your Migration Plan

Tell us where your data lives today. We look before we move.

Why this approach matters

  • No wasted moves.
  • Clean data on day one.
  • A clear view of every step.
  1. Start here

    Step 1: Diagnose

    We list every system that holds your data and find out what needs to move and why.

    You receive A data assessment

  2. Choose what matters

    Step 2: Prioritize

    We pick the data that matters and store the old records you do not need.

    You receive A step by step plan

  3. Do the work

    Step 3: Deliver

    We map, clean and run test loads, with checks at every step.

    You receive Data maps and test results

  4. Check the result

    Step 4: Prove

    We check counts and records before the switch, apart from any business numbers.

    You receive Checks before the switch

  5. Keep improving

    Step 5: Improve

    After the switch we fix data issues your users report and write down rules for future imports.

    You receive A review after go-live

What you receive

A Migration Plan made for your data, your systems and your go-live date.

Case study / Business Central data

Imtra

Four sources became one clean import.

Stock data lived in 4 places, kept by hand. The fix was one import into Business Central.

A white boat bow with a steel anchor and chain on a teak deck over clear blue water

Result

Stock sources kept by hand

Before

4

After

1

Source: Redefine case studies.

  1. 01 / Problem

    Stock came from 4 sources.

    Staff kept stock in 4 places by hand, so counts did not match.

  2. 02 / Diagnosis

    The data was the problem.

    With no single source, every sync needed a person.

  3. 03 / Action

    One import, then automate.

    We joined the sources into one import into Business Central.

  4. 04 / Result

    About 85% of sync steps automated.

    Manual ERP sync steps were replaced by an automatic push.

We did this for Imtra. It was a Business Central data project, not a full migration. The same team plans your move.

Your plan

See what your Migration Plan covers.

This is the written plan a Redefine consultant sends after looking at your data. It shows what moves, what stays and how we check it.

Sections
5
Sources mapped
1
Test loads
First
Get Your Migration Plan

Redefine

Confidential

Prepared for: your business

Migration Plan

Contents

  1. 01Your data sources3
  2. 02Field map7
  3. 03Clean and check report12
  4. 04Switch and roll back plan18
  5. 05An owner for each step22

Migration Plan

Your business

01 / 05

Top issue

Customer copies

Your old system has the same customer saved more than once. Moved as is, orders and bills would split.

Customer records that need a fix

Risk level

High

Priority

High

Fix it in this order

Find copies Merge them Test load

How your Migration Plan is laid out: the cover and page 3.

What is the REDEFINE Method?

The REDEFINE Method is Redefine Innovations' business-first framework for identifying business constraints, prioritizing improvements, delivering appropriate solutions, verifying outcomes, and sustaining improvements.

It has five stages: Diagnose, Prioritize, Deliver, Prove and Improve. Read the REDEFINE Method

How much does Dynamics 365 data migration cost?

The price depends on how much data you have and how many systems it lives in.

You get a written proposal with every cost before work starts.

How long does a data migration take?

It depends on your data size and how clean it is.

After a first look, we give you a timeline made for your move.

What systems can you move data from?

We move data from older ERPs, older Dynamics versions, CRMs like Salesforce, and spreadsheets.

We look at each source first, so we know how to map it.

How do you keep the data right?

We map each field, clean the records and run test loads. We check counts before the final switch.

Each issue gets logged and fixed before go-live.

How is this different from Dynamics 365 optimization?

Data migration moves your data into Dynamics 365. Optimization makes a live system work better.

Many teams do the move first and tune later: See Dynamics 365 optimization

What happens after the switch?

We fix data issues your users report during the agreed support time after go-live.

You also get rules for clean imports later. See Dynamics 365 support

Migration plan

Get your Migration Plan

Know what moves, what stays and how it gets checked. Tell us where your data lives today.

Operations lead reading a printed Dynamics 365 Migration Plan at a long table in the morning
  • A person reads every request
  • A written plan
  • 25+ years building business systems
  • 550+ projects delivered

Your Migration Plan

Tell us which systems hold your data now. A short note is fine.

  1. 1We read your answers
  2. 2We look at your data
  3. 3You get your plan
  4. 4You choose the next step