Azure Modernization

Your existing systems
on Azure.
Production running the whole time.

We migrate Microsoft workloads to Azure using the right path for your stack. NAV 2016 to Business Central. On-premises SQL to Azure SQL. Legacy monolith to managed microservices. Your IT team stays in control, and production never goes down.

0
Downtime events across 47 migrations
4
Migration paths tailored to your stack
30%
Avg infrastructure cost saved within 18 months

Live migration in progress

On-Premises0% migrated
On-Prem Server
NAV / SQL Server
Active Directory
Legacy App Server
Azure VM / App Service
Azure SQL / Dynamics 365 BC
Microsoft Entra ID
Azure DevOps Pipelines

Each service migrated independently. Production stays live.

Cinema band · IT team reviewing Azure migration architecture plan

IT team at a desk reviewing an Azure migration architecture diagram beside a laptop showing the Azure Portal with an all-green Azure DevOps pipeline, soft overhead office light

Before we touch a single server

We choose your migration path based on what you are running today, how much your team can support, and whether production can tolerate any disruption. Not from a template. From the assessment.

Replace with IT team reviewing Azure architecture diagram, overhead light, side profiles · 1600×533

What On-Premises Infrastructure Actually Costs You

On-premises infrastructure
carries a real monthly cost.
Most IT leaders cannot see it until they add it up.

On-premises costs that never appear on a single invoice. Here they are, line by line.

Cost driver
On-premises
Azure cloud
Hardware refresh
Every 3-5 yrs, $40-200k
Zero capex
Scaling capacity
Over-provision or under-serve
Scale in minutes
Security patching
Manual, delayed, risky
Automated, Microsoft-managed
Downtime cost
Single-region, no failover
99.9%+ SLA, geo-redundant
Compliance readiness
Manual evidence collection
Built-in audit trails
Remote access
VPN complexity, limited
Secure access from anywhere

Azure's pay-as-you-go model cuts total infrastructure spend by 25 to 40% within 18 months of migration. That is the range Redefine clients land in.

Pain · IT manager reviewing on-premises server cost reports

IT manager at a desk calmly reviewing an Azure Cost Management report showing infrastructure costs trending down after migration, warm window light, side profile

"We were burning 3 days a month on patches and server maintenance. After moving to Azure, the engineering team spent that time building instead."

Based on patterns from Redefine Azure client onboarding sessions

Replace with IT manager reviewing server cost reports, natural window light, side profile · 800×1000

Four Migration Approaches

Four migration paths.
One fits what you are running today.

Pick the approach that matches your current infrastructure and your tolerance for change. Each path uses different Azure services. Each has a different timeline and risk level. The assessment tells you which one fits your situation.

Lift-and-Shift

Low risk

Move your current servers and applications to Azure with minimal code changes. You reach Azure in the shortest timeline. Cost savings from hardware elimination start immediately. Performance optimization continues after go-live.

Best for: on-premises VMs, SQL Server instances, legacy apps that must move fast
Timeline: 4 to 8 weeks per workload
Immediate benefit: hardware cost eliminated, Azure SLA active
Azure MigrateAzure VMAzure VNetAzure Site RecoveryAzure Backup

Azure Migrate assessment output

azure-migrate.assessmentReady to migrate
VMs assessed
24
Ready
22
Estimated monthly Azure cost: $4,200 · Current on-prem: $7,100 · Saving 41%

Replatform

Medium risk

Move to Azure-managed services without rewriting your application. SQL Server moves to Azure SQL Managed Instance. On-premises apps move to Azure App Service. Your business logic stays intact. The infrastructure becomes Azure's responsibility.

Best for: NAV to Business Central, SQL Server to Azure SQL MI, ERP to cloud
Timeline: 8 to 20 weeks depending on data complexity
Benefit: managed patching, built-in HA, automatic backups
Azure SQL MIApp ServiceAzure Integration RuntimeEntra IDD365 Business Central

NAV to Business Central migration plan

replatform.migration-plan
Data migration to Azure SQLComplete
C/AL to AL extension conversionIn progress
Entra ID SSO configurationPending
Business continuity: all orders processing on NAV until BC cutover confirmed

Refactor

Medium-high risk

Rewrite the infrastructure layer to use Azure Functions, Service Bus, and Cosmos DB. Your business logic stays in place. The infrastructure becomes serverless and auto-scaling. This path delivers the highest infrastructure cost reduction, typically 50 to 70%.

Best for: apps with solid business logic but outdated infrastructure patterns
Timeline: 12 to 24 weeks
Benefit: serverless scaling, 50-70% infrastructure cost reduction
Azure FunctionsAzure Service BusCosmos DBAzure API ManagementAzure DevOps

Serverless refactor: order processing module

azure-functions.execution-log
[10:42:01] ProcessOrder triggered · 48ms · 200
[10:42:01] NotifyWarehouse triggered · 22ms · 200
[10:42:02] UpdateInventory triggered · 31ms · 200
[10:42:02] ChargePayment triggered · 94ms · 200
Avg execution: 48ms · Cold start: disabled · Cost: $0.000002/execution

Rearchitect

Highest ROI

Break your monolithic application into independent services running on AKS and Azure Container Apps. Each team deploys on its own schedule. No deployment freezes. No one team blocking everyone else. This path carries the highest investment and the strongest return on that investment.

Best for: SaaS platforms, B2B apps with high concurrency and team scalability needs
Timeline: 16 to 32 weeks
Benefit: independent deployments, auto-scaling, fault isolation
AKSAzure Container AppsAzure Event GridAzure Front DoorAzure DevOps Pipelines

AKS cluster: post-rearchitect status

aks.cluster-statusAll pods healthy
order-svc
3/3 running
auth-svc
2/2 running
payment-svc
2/2 running
notify-svc
Deploying...
What We Build and Configure

Six Azure practice areas.
Each scoped, built, and handed over.

Value · Azure architecture planning session, whiteboard with cloud diagram

Two cloud architects at a desk reviewing Azure Portal resource groups and a green Azure DevOps pipeline on a monitor, afternoon office light, side angle

Every project starts with an assessment of your current state. You see exactly what will be built and what it costs before any work begins.

Replace with cloud architects reviewing Azure portal on monitor, afternoon light, side angle · 1200×400

Compute and Hosting
Run applications that scale automatically and never miss an SLA

VMs set up with Availability Sets and autoscale rules so demand spikes don't take the app down. App Service deployment slots give your team zero-downtime releases for every code push. AKS clusters handle horizontal autoscaling automatically. Every compute resource stays visible in Azure Monitor dashboards, so your team knows what is happening.

Tap to expand
Data and Storage
Migrate and protect your data without data loss or extended downtime

Azure SQL Managed Instance preserves full SQL Server compatibility so your existing code and queries run unchanged. Cosmos DB gives globally distributed access for applications serving users across regions. Azure Data Factory moves data from on-premises sources without writing migration scripts. Point-in-time restore and geo-replication protect every database from the day it goes live.

Tap to expand
Identity and Access
Give every employee and customer secure access without managing passwords

Microsoft Entra ID gives your team single sign-on across Azure, Microsoft 365, and third-party SaaS from one login. Conditional Access policies block access based on device, location, or risk, without adding friction for normal users. MFA enforced across the board. Customers get their own identity layer through Azure AD B2C. On-premises Active Directory syncs automatically so users keep their existing credentials.

Tap to expand
DevOps and CI/CD
Deploy code in minutes instead of hours, and roll back in seconds if something goes wrong

Azure Pipelines run multi-stage builds and deployments with environment gates so a failed test never reaches production. Branch strategies keep feature development from blocking release schedules. Infrastructure is defined as code using Azure Bicep or Terraform, so every environment is reproducible and auditable. Rollback pipelines trigger automatically on a health check failure.

Tap to expand
Security and Compliance
Build toward ISO 27001, SOC 2, and GDPR readiness from day one

Microsoft Defender for Cloud starts with a security score baseline so your team can see where you stand on day one. Azure Key Vault stores secrets, certificates, and encryption keys out of reach of application code. Network Security Groups and Azure Firewall control what can reach what, without requiring manual firewall rule management. Compliance dashboards track ISO 27001, SOC 2, and GDPR readiness. Audit logs flow to Azure Monitor automatically.

Tap to expand
Monitoring and Analytics
See what your Azure environment is doing in real time, before users notice a problem

Azure Monitor dashboards show infrastructure health so your team spots degradation before users feel it. Application Insights traces every request end to end, so finding the source of a slow response takes minutes, not hours. Log Analytics stores and queries operational data with custom alerting. Alerts fire before SLA thresholds are breached. Power BI connects directly to Azure SQL so operational reports update in real time without manual exports.

Tap to expand
Client Result — WP Inova

Production never stopped.
NAV 2016 moved to Business Central
on Azure in full operation.

Proof · Team reviewing Azure Business Central dashboard after migration

Operations team gathered at a monitor viewing a healthy Business Central on Azure dashboard with green KPIs after migration, screen glow against a dark backdrop
Client

WP Inova

Azure live

B2B Operations · Azure Cloud · Business Central

The Problem

WP Inova was running NAV 2016, which couldn't handle order centralization across platforms or scale with their growth. Customization was limited by the old C/AL codebase. The team was maintaining a system that was holding the business back.

The Azure Result
0
limitations removed

Business Central on Azure replaced NAV 2016 with no production downtime. Orders now centralize across all platforms in one system. Compliance controls are built into the Azure environment. The ERP scales as the business grows, without the constraints the old codebase imposed.

Replace with team reviewing Azure Business Central dashboard · 1200×400

Migration milestones

1

Azure foundation built — subscriptions, VNet, Entra ID, and Active Directory sync completed

Azure subscription, resource groups, VNet, Entra ID tenant configured. On-premises Active Directory synced.

2

Migration plan validated — C/AL to AL conversion complete, data volumes mapped, NAV still running

C/AL code converted to AL extensions. Data migration plan validated against production data volumes. NAV continues operating.

3

Data moved — Azure Integration Runtime transferred on-premises SQL to Azure SQL, both systems running in parallel

Data migrated using Azure Integration Runtime. Parallel operation between NAV and Business Central during validation period.

4

Business Central goes live — orders process on BC, NAV decommissioned the following week, zero downtime throughout

Traffic cutover completed. Business Central handling all order workflows. Azure Monitor dashboards live. NAV decommissioned week after validated go-live.

0
Production downtime during migration
100%
Order history migrated to Azure SQL
Also on Azure

Lanrover — Dynamics 365 Business Central on Azure

Legacy ERP retired, replaced with Business Central. Azure infrastructure design and Entra ID identity management deployed from scratch. Finance, sales, and customer data now live in one system, with compliance controls built in.

What Separates Our Azure Projects From Stalled Ones

Five patterns that determine whether an Azure project ships or stalls.

These are the gaps we see every time we take over an Azure project from another implementation partner.

01
The assessment comes before the proposal, not after you have already committed.
We read your current infrastructure, map your dependencies, and document the migration path before sending a proposal. The scope you approve is the scope we build. No surprise change orders when we find the complexity that was always there.
02
Production stays live during every phase. Every time.
We use parallel-run, blue-green deployment, and Azure Traffic Manager cutover strategies. Your production systems process real orders and serve real users throughout every migration phase. We have never taken a client's app down for a migration and we will not start with yours.
03
Code you own from day one. No lock-in.
All Azure resource configurations, Bicep templates, pipeline YAML, and AL extensions live in your repository from the first sprint. We leave no proprietary systems, no credentials that only we hold. Your next developer can take over without calling us. That is by design, not an accident.
04
Azure DevOps pipelines handed over, not just delivered.
Every pipeline includes documentation, runbooks, and a 2-hour walkthrough session with your team. From go-live, your team can run, monitor, and troubleshoot the Azure environment without calling us first. We do not create ongoing dependency for routine operations.
05
The right path. Not the fastest upsell.
If Lift-and-Shift solves your problem in 6 weeks, we propose Lift-and-Shift. We do not propose Rearchitect to a client whose workload does not warrant it. The path recommendation comes from the assessment, not from our preferred project size.
Common Questions Before Committing

What IT leaders ask before starting an Azure migration.

Timeline, downtime risk, and full ownership. Answered directly, without the sales pitch.

How Azure modernization is priced

The assessment comes before any cost discussion. What you pay depends on your current infrastructure, the migration path chosen, and your project timeline.

The written proposal breaks cost down by phase. You approve everything before any work begins.

Lift-and-Shift per workload: 4 to 8 weeks. Replatform, such as NAV to Business Central: 8 to 20 weeks depending on data volume and complexity. Refactor to serverless: 12 to 24 weeks. Rearchitect to microservices on AKS: 16 to 32 weeks. Phase-level estimates come from the assessment before any work begins. Your first Azure resources are live and running by the end of week one, regardless of total project length.
No planned downtime. We use Azure Traffic Manager, blue-green deployments, and parallel operation strategies to keep production live throughout. If a specific component requires a brief maintenance window due to a technical constraint, we flag it in the assessment before any code changes, never on the day of deployment. Every migration we have delivered has maintained production continuity throughout.
You own everything from day one. The Azure subscription lives in your tenant. The repository lives in your source control. Pipelines run in your Azure DevOps organization. No proprietary tooling. No Redefine-controlled secrets or credentials. The handover package includes architecture decision records, resource naming conventions, Bicep templates, pipeline YAML, runbooks, and a live walkthrough session with your team. Nothing lives with us after handover.
Azure development is building new applications on Azure from the start. Azure modernization starts with your existing infrastructure or application and moves it to Azure with targeted improvements. Modernization requires assessment, dependency mapping, migration planning, parallel operation, and cutover — skills that are different from greenfield Azure development. Our Azure development services covers new builds; this page covers migration and modernization of existing workloads.
The assessment answers this. Generally: Lift-and-Shift if you need to eliminate hardware costs fast. Replatform if you are running an ERP like NAV and want Business Central's modern features. Refactor if your app's business logic is sound but the infrastructure patterns are outdated. Rearchitect if you have multiple teams deploying to the same codebase and it is slowing everyone down. We recommend the path with the best return for your specific situation, not the most complex project.
Is Azure Modernization Right for You Now?

Which of these sounds like your IT environment right now?

Azure modernization is the right call for some IT environments and the wrong timing for others. The assessment costs nothing. Starting the wrong project at the wrong time does.

Match score0 of 6 selected

Running on-premises servers with hardware refresh due in 12 to 24 months

Moving to Azure before the hardware refresh typically costs less than the refresh itself. The migration pays for itself.

Operating Dynamics NAV, CRM, or a legacy ERP without a clear upgrade path

Business Central and Dynamics 365 on Azure are the clear upgrade paths for legacy ERP systems. The data migration is the hard part. We have done it.

No Entra ID and teams accessing internal systems without SSO or MFA

Setting up Entra ID, SSO, and MFA is typically the fastest Azure modernization with the most immediate security impact. One sprint. Measurable improvement in access control and compliance readiness.

No CI/CD pipeline and deployments taking a full day or requiring manual steps

Azure DevOps Pipelines cut deploy time from hours to minutes and eliminate the risk of manual deploy-day errors.

Probably not the right moment for Azure modernization if:

Your infrastructure is already on Azure and running well on a supported stack

Azure optimization or new feature development may be the right next step, not modernization.

You have under 3 months of runway and need to ship revenue features

A modernization project during a short runway pulls engineering focus away from revenue-generating features. Wait until the runway is clear.

Get Your Azure Migration Plan

Tell us what you are running. Get a written Azure migration plan in 3 days.

No commitment. No pitch. Submit your infrastructure brief today and receive a written Azure migration proposal within 3 business days.

01

Submit your infrastructure brief

Tell us what you are running today: server types, ERP version, identity setup, deployment process. No need to prepare a document.

02

Azure assessment call within 48 hours

One of our Azure migration consultants joins the call. We map your current stack and identify the right path for your environment.

03

Written Azure modernization proposal in 3 days

Recommended path, Azure services, migration sequence, timeline, and phase-by-phase cost estimate.

04

First Azure resources live in Sprint 1

Environment setup, Entra ID, and first migrated workload in your first sprint. Production still running throughout.

Form

No sales calls. No commitment. Assessment in 48 hours. Written proposal in 3 days.

48 hours
First assessment call
3 days
Written migration proposal
47+
Azure migrations completed
0
Production downtime events

Get on a call with us to see how we can help you

Get a Quote