SAP integration

Connect SAP to your store, CRM, WMS and EDI.

Connect SAP to your store, CRM, WMS and EDI. Run Dynamics 365 too? See Dynamics 365 integration.

Lano Equipment (another ERP): catalog loads in 0.7s, from 4.8s.

Results

One team for systems that must agree

Real numbers from our records and from a client whose store now syncs with its ERP.

  • Redefine Innovations
    550+
    Projects delivered for companies that sell online and run an ERP.
  • Redefine Innovations
    25+
    Years of building stores, ERP links and the code between them.
  • Lano Equipment
    0.7s
    Full catalog load, down from 4.8s, on a store synced with its ERP.

Source: Redefine records and the Lano Equipment case study. Lano runs another ERP, not SAP.

Get your Scoped SAP Integration Proposal.

Your SAP flows, the order to build them, and how cost is set.

Get My SAP Integration Proposal

SAP data should reach every team on its own.

Orders, stock, prices and bills move from SAP to the right systems. Each team works from the same numbers.

Operations lead checking web store orders that landed in the SAP Fiori Manage Sales Orders list

Short answer

What is SAP integration?

Updated

SAP integration links SAP S/4HANA, ECC or Business One to your other systems, like your store, CRM, warehouse and EDI. Orders, stock, prices and bills then move between them, so no one types them in twice. Redefine Innovations plans, builds and watches these links for operations and finance teams.

In many companies, SAP holds the truth, but the store, the CRM and the warehouse each keep their own copy. Staff type data from one to the other. The copies drift, and mistakes reach customers.

We first agree who owns each record, like customers and items. Then each flow gets a direction, a check and one owner.

Three ways to move SAP data

Pick by how much data moves

WayWhat you getBest whenWhere it stops
Type it by handA few orders a weekNo build costSlow, and typos slip in
One-off scriptsOne file, one timeA quick fixBreaks with no alert
Planned integrationOrders and stock move dailyTested flows with alertsNeeds a clear owner

What we look at first

  • [1] Your SAP version and modules
  • [2] The systems around SAP
  • [3] The steps typed by hand
  • [4] Who owns each record

On Business One? See SAP Business One consulting. Need SAP reports? See Power BI and SAP integration.

One team

Four vendors become one team

An SAP project often needs four vendors. We do all four jobs, so one team owns your SAP data flows.

Get My SAP Integration Proposal

Before

One runs the store, one the CRM, one the warehouse, one the EDI. When data goes wrong, nobody owns the fix.

  • Store agency

    Owns the store

  • CRM consultant

    Owns the CRM

  • WMS or 3PL

    Owns shipping

  • EDI provider

    Owns retail orders

After

Redefine covers all four, with one team for your SAP data flows.

Redefine Innovations

One team

  • Store
  • CRM
  • Warehouse
  • EDI

Four SAP problems we fix.

  1. Problem 1 of 4

    Re-keyed orders

    Web orders typed into SAP.

    Each store order is typed into SAP by hand. It is slow, and typos slip in. See Shopify integration services

    Order clerk typing a printed web order into the SAP Business One Sales Order window
  2. Problem 2 of 4

    Out of sync

    Stock and prices disagree.

    The store and the CRM fall behind SAP. Buyers see the wrong price or order what is gone. See inventory sync

    Store manager circling a stock count on a printed SAP list that does not match the Shopify Inventory page
  3. Problem 3 of 4

    Lost shipments

    Shipped, but not in SAP.

    Your WMS or 3PL ships the box, but the shipment never posts back. Bills wait. See 3PL integration

    Warehouse lead writing order numbers on a clipboard list of shipments not yet posted back
  4. Problem 4 of 4

    EDI by hand

    Retail orders typed in.

    Big retailers send EDI orders, and staff still type them into SAP. Orders ship late. See EDI integration

    Customer service rep entering a printed retailer purchase order in the SAP Fiori Create Sales Order app

Cost of typing

What does typing orders into SAP cost you?

Set how many orders your team types into SAP. Use your own numbers. It is an estimate, not a promise.

Your numbers

Your estimate

400
6 min
$40

Estimate: orders a month x minutes for each / 60 x cost of one hour. Fixing typos costs more on top.

Cost per month

$1,600

What typing orders into SAP costs your team each month.

Hours per month

40

Over a year

Your estimate

  • Cost of typing in a year$19,200
  • Hours of typing in a year480 hours
Get My SAP Integration Proposal

An engineering mindset for SAP integration

We run growth the way engineers run software.

Redefine Innovations is an engineering company. Developers, ERP engineers and marketers sit on one team, so a fix reaches the system, not just a slide deck.

  1. Two engineers at a whiteboard showing store, SAP and warehouse with the line Done when orders match

    01 Our way: How we work

    Every change is a test with a success number.

    Like orders that match in SAP and the store.

    Old way: Instead of the usual consultant habit

    Changes ship on opinion.

    Nobody checks if it helped.

  2. Developer writing the code that posts store orders to SAP, with the tests passing

    02 Our way: How we work

    Engineers build and fix the links.

    We write, test and run the code.

    Old way: Instead of the usual consultant habit

    Advice stops at a slide.

    The fix never reaches SAP.

  3. Operations manager reading an email alert about orders that failed to post, with him named as owner

    03 Our way: How we work

    Alerts fire the week a number drifts.

    Each alert has a plan and one owner.

    Old way: Instead of the usual consultant habit

    Problems wait for the monthly report.

    By then, the cost is already paid.

How Redefine works

TheREDEFINEMethod

Start with the flow your staff type most.

The first flow to connect is most often the one your staff type in most. Before we build, we agree who owns SAP master data, like customers and items.

Get My SAP Integration Proposal

You get a scoped proposal after the talk.

Why this approach matters

  • Each flow is checked against a number.
  • The flows that save the most time go first.
  • The links change as your business does.
  1. Start here

    Step 1: Diagnose

    We map the SAP records that move, the systems around SAP, and each step typed by hand.

    You receive A map of your SAP flows

  2. Choose what matters

    Step 2: Prioritize

    We rank each flow by the hand work and cost it saves.

    You receive Your ranked plan

  3. Do the work

    Step 3: Deliver

    We build and test each link between SAP and your other systems.

    You receive Updates as each flow goes live

  4. Check the result

    Step 4: Prove

    We check matched records against the number we agreed.

    You receive Checked results

  5. Keep improving

    Step 5: Improve

    We review alerts and failed records, and adjust as your business changes.

    You receive Regular reviews

What you receive

A map of your SAP flows, a ranked plan, tested links and checked results.

Store and ERP, one team

How Lano Equipment got a fast store synced with its ERP

Headless store and ERP

Lano Equipment

Sells, rents and services heavy equipment. It runs another ERP, not SAP.

More qualified inquiries from the new site
+15%
A Lano Equipment tractor carrying a hay bale on a farm road at sunset
A Lano Equipment tractor. Photo from the Lano Equipment case study.

The problem

The old site was slow. Its parts catalog took 4.8 seconds to load, and buyers left before they asked.

What we did

We built a new headless store and synced its catalog with the ERP. The same team does SAP links today.

  • ERP sync
  • Headless store
  • Fast catalog
  • New site

The result

  • Full catalog loads in 0.7s, from 4.8s
  • 15% more qualified inquiries
  • A store catalog fed by the ERP

Lano runs another ERP, not SAP. We show it because the work is the same: a store and an ERP that agree. Read the Lano Equipment story.

Your proposal

Get your scoped SAP integration proposal.

After the talk, you get a written plan for your SAP links. It shows each path, the order to build them and how cost is set.

Sections
5
Top finding
1
Next step
Scoped
Get My SAP Integration Proposal

Redefine

Confidential

Prepared for: your company

Scoped SAP Integration Proposal

Contents

  1. 01SAP version and systems3
  2. 02Data flows and direction7
  3. 03Connection options to confirm12
  4. 04Errors and alerts18
  5. 05Phases and how cost is set22

Scoped SAP Integration Proposal

Your company

01 / 05

Top finding

Orders typed in

Store orders are still typed into SAP by hand. That flow goes first.

Your SAP flows, in build order

Biggest gain

Less typing

Priority

High

Build in this order

Orders Stock Shipments and EDI

How your Scoped SAP Integration Proposal is laid out: the cover and page 3.

What is SAP integration?

SAP integration links SAP S/4HANA, ECC or Business One to your store, CRM, warehouse and EDI.

Data moves on its own, so staff stop typing it twice and the numbers stay right. See ERP integration services

Which SAP versions can Redefine connect?

We connect SAP S/4HANA, ECC and Business One.

Each one links in its own way. In scoping, we check your version, your modules and the systems to link.

Can Redefine handle SAP Business One integration?

Yes. We look at the Service Layer and the DI API when we scope the work.

Then we build and test the order, stock and bill flows between Business One and your other systems. See SAP Business One consulting

Does Redefine use middleware or direct APIs?

It depends on your systems. We look at direct APIs, OData, BAPIs, EDI, flat files, middleware and iPaaS.

We pick the best way for each flow when we scope the work. See EDI integration services

How are SAP errors and failed records handled?

Failed records are logged, tried again, or held for review. An alert goes to the owner.

The proposal sets the retry rules, the review steps and who gets each alert.

How much does SAP integration cost?

It depends on the scope and how many flows you need.

We set the cost in your proposal, after the first talk.

How long does an SAP integration take?

It depends on the scope.

Your proposal shows the phases and the timeline once we know your systems.

What is the REDEFINE Method?

The REDEFINE Method is Redefine Innovations' business-first framework for identifying business constraints, prioritizing improvements, delivering appropriate solutions, verifying outcomes, and sustaining improvements.

It has five stages: Diagnose, Prioritize, Deliver, Prove and Improve. Read the REDEFINE Method

SAP integration services

Start with an SAP integration assessment

Tell us how SAP and your other systems work today. Redefine Innovations looks at your data flows and sends a scoped SAP integration proposal.

Engineer and operations lead marking up a printed outline of their SAP integration proposal
  • A Redefine expert reads every request
  • A scoped proposal after the talk
  • 25+ years of delivery
  • 550+ projects delivered

Your Scoped SAP Integration Proposal

Tell us which SAP version you run and which systems need to talk to it. A short note is fine.

  1. 1Send the form
  2. 2We talk about SAP and your systems
  3. 3We map your SAP flows
  4. 4You get your scoped proposal