
Power BI semantic model development
Many reports reading the same tables in different ways
Map to a single model.
Snowflake integration
For data leaders and IT leaders. Move your data from Snowflake into Power BI, in one model your team can check.
Parsons Kellogg: manual reporting time fell 58% after reports went live in Power BI. See the case study.
Connecting another tool? See our Power BI integration services.

Tables, warehouses and roles in one place. We check old and new numbers side by side until you sign off.
Proof
See success through numbers. Two are our track record; one is a client result.
Redefine is a Microsoft Solutions Partner. Source for 58%: Parsons Kellogg case study.
Ready to connect Snowflake with Power BI?
A quick call sets the project direction.
Short answer
Updated
Snowflake integration connects Snowflake data with Power BI for governed reporting. It is for data and IT leaders. Redefine Innovations maps your key tables and views to one Power BI semantic model. Your team decides what to import and what to query directly.
Redefine builds the reports, checks old and new numbers, and hands over the model.
Checks come first. Old and new numbers sit side by side. Your team signs off before the switch.
Pick by what your team needs
What we list first
Connecting another tool? See our Power BI integration services.
Your tables keep their meaning. The data moves into one model your team can read.
Report time calculator
Use your own numbers to see where your setup stands.
Cost of hours saved
Your estimate
Hours cost saved
$5Kper month
$56K a year from the same hours.
Your call shows where it sits.
Estimate: hours x (share automated after minus share today) x cost of one hour. Not a forecast. Your databases, reports and roles are counted on the call. Your real data gives the real cost.
Snowflake integration
Bring the scattered parts of Snowflake into one clear model.
Each part moves in step with the others.
Tables / Warehouses / Shared data / Roles

Listed and mapped to a semantic model.
Connections set up and tested.
Import or direct query chosen with your team.
Rules lined up with Power BI.

Power BI semantic model development
Map to a single model.




How we work
An engineering mindset for reporting. A method built on structure and checks spots problems early.

How we work · 1 of 4
Every change is tested against a success number.
You see what each change is worth. Old way: Changes ship on opinion. Nobody can say what is true.

How we work · 2 of 4
Engineers fix the data model, refresh and security.
The fix reaches the data, not only the chart. Old way: Fixes stop at the visual. The numbers underneath stay wrong.

How we work · 3 of 4
Every task has a done-when line.
You know when each task is finished. Old way: Done when sent. Nobody checks if it worked.

How we work · 4 of 4
Alerts fire when a number drifts.
Each alert has a planned response and one owner. Old way: Problems appear in the monthly review. By then, the chance is gone.
How Redefine works
Steps to make your Snowflake data fit with Power BI.
We follow a step-by-step approach. Each step ends with something your team can check, so nothing comes as a surprise.
A quick call sets the project direction.
Why this approach matters
Start here
Start here. We inventory the data.
You receive A table map
Choose what matters
Choose what matters. We decide what to import or query.
You receive A data flow plan
Do the work
Do the work. We build the reports.
You receive Checked reports
Check the result
Check the result. We compare old and new side by side.
You receive Team sign-off
Keep improving
Keep improving. We hand over.
You receive A written list of next steps
A governed model, checked reports and a guide to next steps.
Joining Snowflake and Power BI takes a clear view of both tools. We would not skip the check of old and new numbers.
Case study / Reporting moved to Power BI
Sells promotional products and corporate apparel. Runs on Microsoft Dynamics 365.

Reporting took many manual hours.
Diagnosis
The team needed reports on live data they could trust, from stock to the warehouse.
Reports went live in Power BI. Manual work fell and the warehouse moved faster.
The same steps shape your Snowflake integration.
Your Snowflake pack
A look at the models and maps. Five parts take you from table list to team handover.
Redefine
Confidential
Prepared for: your team
Integration Pack
Contents
Integration Pack
Your company
What you have
Table inventory
Every Snowflake table and view is listed, so nothing is missed.
Tables by team
Tables listed
28
Move first
Sales
Check in this order
Sales Finance Operations
Questions
Clear answers before you book your call.
The REDEFINE Method is Redefine Innovations' business-first framework for identifying business constraints, prioritizing improvements, delivering appropriate solutions, verifying outcomes, and sustaining improvements.
It has five stages: Diagnose, Prioritize, Deliver, Prove and Improve. Read the REDEFINE Method
Snowflake integration connects Snowflake with Power BI for governed reporting.
Tables and views move into one model that is easy to read. See Power BI integrations
Your team sets which tables to import, and it is confirmed on the call.
Redefine maps your key tables and views to one model first.
You get reports built on the data model agreed with your team.
The handover guide gives your team instructions for every page. See Power BI audit services
Old and new reports are checked side by side.
Your team signs off before the switch. See semantic model development
Connection and refresh details are set with your team and confirmed on the call.
Each refresh has one owner after handover. See Power BI operations services
Your discovery call
Start here to bring Snowflake into Power BI.

Tell us what feels stuck. A person reads every request.